Final lining at Devil's Slide Tunnel

机译:魔鬼滑道的最后衬砌

获取原文
获取原文并翻译 | 示例
           

摘要

The electrical package consists of six sets of electrical plans (utility and grounding plan; lighting plan; power plan; traffic system plan; fire life safety plan and instrumentation plan).n The following are examples of challenges that were addressed daily: * The construction of concrete abutments concurrent to the excavation process and the impacts to access during each respective cycle. * A minimum of 152 m (500 ft) is required to adequately park and stage all excavation equipment in each tunnel drive. * Haul truck traffic is impeded when placing arch concrete. * Ventilation system orientation does not allow lining operations Io proceed past 1.3 way through the tunnel (Cross Passage 3). * The installation of a noncontinuous final arch invert in each of the tunnels. [...] the benefits to concurrent mining while lining provide a key advantage to future tunnel projects.
机译:电气包包括六套电气计划(公用设施和接地计划,照明计划,电源计划,交通系统计划,消防生命安全计划和仪器仪表计划)。n以下是每天应对的挑战示例:*施工开挖过程中同时发生的混凝土基台的数量以及在每个相应循环中的进入影响。 *每个隧道驱动器中至少需要152 m(500 ft)才能充分停放和分级所有挖掘设备。 *放置拱形混凝土时,运输卡车的交通会受到阻碍。 *通风系统的方向不允许衬砌操作穿过隧道1.3度(穿越通道3)。 *在每个隧道中安装一个不连续的最终拱形倒立装置。 graco.com graco.com衬砌同时开采的好处为未来的隧道项目提供了关键的好处。

著录项

  • 来源
    《Mining Engineering》 |2011年第6期|p.1-5|共5页
  • 作者

    Stephen Liu;

  • 作者单位

    Stephen LiuStephen Liu, UCA of SME member, is project engineer, Kiewit Infrastructure Group, Omaha, NE, e-mail stephen.liu@kiewit.com;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号