...
首页> 外文期刊>New Civil Engineer International >New High Speed 2 boss re-engineers scheme to speed delivery
【24h】

New High Speed 2 boss re-engineers scheme to speed delivery

机译:新的High Speed 2 Boss再造计划加快交付速度

获取原文
获取原文并翻译 | 示例
           

摘要

New High Speed 2 (HS2) boss Sir David Higgins has scrapped plans to link HS2 to High Speed 1 (HS1) and the Continent via the North London Line railway. "The current proposed HS2-HS1 link is, I believe, sub-optimal and should be reconsidered," says Higgins in a report on the HS2 project published on Monday. Soon after Higgins presented his report, UK transport secretary Patrick McLoughlin confirmed that the S1.16bn link to HS1 would be removed from the phase one hybrid bill for the London to Birmingham line as would the safeguarding of this section of the route.
机译:新的High Speed 2(HS2)老板David Higgins爵士取消了通过北伦敦线铁路将HS2连接到High Speed 1(HS1)和大洲的计划。希金斯在周一发表的有关HS2项目的报告中说:“我认为,当前建议的HS2-HS1链接不是最佳的,应该重新考虑。”希金斯提交报告后不久,英国运输部长帕特里克·麦克劳林(Patrick McLoughlin)确认,从伦敦至伯明翰线的第一阶段混合法案中,将取消与HS1的S11.6亿美元的链接,同时也将保护这条路线。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号