首页> 外文期刊>New scientist >Big mow: tar lawsuit
【24h】

Big mow: tar lawsuit

机译:大m:焦油诉讼

获取原文
获取原文并翻译 | 示例
           

摘要

The battle over a proposed pipeline to ferry raw bitumen took a new turn last week when environmental groups filed a lawsuit claiming that TransCanada Corporation has illegally begun construction on the pipeline without full US government approval. But the claim is not that simple. The Keystone XL pipeline, intended to carry up to 1.3 million barrels per day of raw bitumen from tar sands in Alberta, Canada, to refineries in the US, has provoked intense controversy. Extracting tar sand oil is far more carbon-intensive than conventional oil. Critics of the pipeline point out that the risk of breaks is greater than for other pipelines because bitumen is more corrosive and its viscosity will put extra pressure on the pipe walls.
机译:上周,有关拟议中的运送生沥青的管道的战斗发生了新的转变,当时环保组织提起诉讼,声称TransCanada Corporation已在未经美国政府完全批准的情况下非法开始在该管道上进行建设。但是索赔并不那么简单。 Keystone XL管道计划每天从加拿大艾伯塔省的焦油砂中提炼出多达130万桶的原始沥青,再到美国的炼油厂,引起了激烈的争议。提取焦油砂油的碳强度远高于常规油。对该管道的批评者指出,破裂的风险比其他管道要大,因为沥青更具腐蚀性,并且其粘性会在管道壁上施加额外的压力。

著录项

  • 来源
    《New scientist》 |2011年第2834期|p.4|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号