...
首页> 外文期刊>Offshore Engineer >Slow and steady wins the race
【24h】

Slow and steady wins the race

机译:踏实和稳重是赢得比赛的关键

获取原文
获取原文并翻译 | 示例
           

摘要

The Hess-operated Stampede development project is one of the few mega projects in development in the US Gulf of Mexico (GoM), and according to Hess, it is one of the largest undeveloped fields in the GoM. The New York-headquartered firm aims to bring the field online by 2018, and to keep costs down while doing it. With only one in five mega projects coming within 10% of budget and schedule, Stampede is on track to be one of them, despite the low oil price environment where value erosion is easy, but value creation is difficult to achieve, said Stephen Whitaker, project director-Stampede Development, Hess, at a luncheon hosted by the Marine Technology Society in Houston in back in August 2016.
机译:由Hess经营的Stampede开发项目是美国墨西哥湾(GoM)中为数不多的大型开发项目之一,根据Hess的说法,它是GoM中最大的未开发油田之一。这家总部位于纽约的公司旨在到2018年使该领域上线,并在这样做的同时降低成本。史蒂芬·惠特克(Stephen Whitaker)说,尽管五分之一的大型项目的预算和进度都在预算和进度的10%之内,但尽管油价低廉,容易造成价值侵蚀,但创造价值却很困难,尽管如此,斯坦佩德还是有望成为其中的一个项目。 2016年8月,在休斯敦海洋技术协会主办的午餐会上,项目总监-斯坦普德发展公司(Hess)的午餐。

著录项

  • 来源
    《Offshore Engineer》 |2017年第1期|14-16|共3页
  • 作者

    Jerry Lee;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号