...
首页> 外文期刊>Offshore >DP FPSO used a temporary production facility offshore China
【24h】

DP FPSO used a temporary production facility offshore China

机译:DP FPSO在中国近海使用了临时生产设施

获取原文
获取原文并翻译 | 示例
           

摘要

The FPSO Munin was modified, mobilized and put into operation on the West River field, offshore China, to continue production while the field's permanently moored FPSO was in dry dock for essential maintenance. The project was unique in that the Munin relies solely on its dynamic positioning system for station keeping during production, while also offloading to conventional non-DP off-take tankers. In October 2004, the FPSO producing the West River field offshore China was scheduled for dry dock for its 5-year special survey and extensive maintenance, repair and Me extension works. These activities were scheduled to last 160 up to 190 days. To minimize production loss during this period, the field's operator searched the market for a temporary production facility capable to replace the FPSO.
机译:FPSO Munin在中国海上的西河油田进行了改装,动员并投入运行,以继续生产,而该油田的永久性系泊FPSO则在干船坞进行必要的维护。该项目的独特之处在于,Munin仅依靠其动态定位系统在生产过程中进行站位维护,同时还可以将其卸载到常规的非DP承运油轮上。 2004年10月,计划在中国近海生产西河油田的FPSO计划在干船坞进行为期5年的特殊勘测以及广泛的维护,维修和扩建工程。这些活动计划持续160到190天。为了在此期间最大程度地减少生产损失,该油田的运营商在市场上寻找能够代替FPSO的临时生产设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号