首页> 外文期刊>Nafta >CURRENT OIL NEWS (Country, Region, World)
【24h】

CURRENT OIL NEWS (Country, Region, World)

机译:最新的石油新闻(国家,地区,世界)

获取原文
获取原文并翻译 | 示例
           

摘要

Janaf je u razdoblju od 1. sije?nja do 30. rujna 2010. godine prevezao ukupno 5,2 milijuna tona nafte, stoje za 3,9% manje od koli?ina u istom razdoblju 2009. godine, ali i za 1,8% vi?e od planiranog. Neto dobi3t Jadranskog naftovoda u prvih devet mjeseci iznosila je 91,4 milijuna kuna, 9,7% vi?e nego u istom razdoblju pro?le godine.%In the period from 1 January to 30 September 2010 Janaf transported a total of 5.2 million tonnes of oil, which is 3.9% less than the amount in the same period of 2009, but 1.8% more than planned. Net profit of Janaf in the first nine months amounted to 91.4 million kuna, 9.7% more than in the same period last year. The pipeline length is 109 km, of which the Hungarian share is 47 km, and the capacity is 1.75 billion m3. MOL invested around 33.3 million euros in the construction of the pipeline.
机译:在2010年1月1日至9月30日期间,Janaf共运输了520万吨石油,比2009年同期减少3.9%,但减少了1.8吨。比计划多%。亚得里亚输油管道公司前9个月的净利润为9140万挪威克朗,比去年同期增长9.7%。%在2010年1月1日至9月30日期间,贾纳夫运输了520万吨石油,比2009年同期减少3.9%,但比计划增加1.8%。 Janaf前九个月的净利润为9140万库纳,比去年同期增长9.7%。管道长度为109公里,其中匈牙利占47公里,运力为17.5亿立方米。 MOL投资约3,330万欧元用于管道建设。

著录项

  • 来源
    《Nafta》 |2010年第11期|p.489-490|共2页
  • 作者

    Ivica Billege;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号