首页> 外文期刊>IEEE Transactions on Parallel and Distributed Systems >Parallel processing applied to the planning of hydrothermal systems
【24h】

Parallel processing applied to the planning of hydrothermal systems

机译:并行处理应用于水热系统规划

获取原文
获取原文并翻译 | 示例
           

摘要

The objective of the long-term operating planning problem is to determine the optimum strategy for the generation of electricity, aiming toward the minimization of total operating cost over the planning period. In a competitive electricity market, with the participation of a significant number of hydroplants, such as in Brazil, precision modelling for operating planning is required so that a better use of hydraulic resources can be obtained. We present a long-term operating planning model based on an individual power plant representation. In order to support the high computational burden, a suitable parallel processing algorithm is proposed.
机译:长期运营计划问题的目的是确定最佳的发电策略,以期在计划期内将总运营成本降至最低。在竞争激烈的电力市场中,在巴西等大量水电厂的参与下,需要对运行计划进行精确建模,以便更好地利用水力资源。我们提出了基于单个电厂代表的长期运营计划模型。为了支持高计算量,提出了一种合适的并行处理算法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号