...
首页> 外文期刊>PCI Journal >Yellowstone Club
【24h】

Yellowstone Club

机译:黄石俱乐部

获取原文
获取原文并翻译 | 示例
           

摘要

Yellowstone Club is a 15,200-acre private residential community nestled in the heart of the Rocky Mountains. One of its most recent additions is the exclusive and unique Yellowstone Club Village Core, a collection of five structures that provide luxury residences, ski facilities, and private ski club access, along with unique amenities and a gathering space. The designers of this high-end destination originally considered a cast-in-place design. However, a total structural precast concrete solution was ultimately chosen to accelerate construction and provide a more durable set of structures. Using emulative design to convert the project from cast-in-place to precast concrete, the designers were able to cut 24 months from the construction timeline, allowing them to finish the project in just one year. To meet the aggressive timeline, the stakeholders facilitated a fast-track schedule through four seasons. Throughout the project, workers battled extreme weather and several severe freeze-thaw cycles.
机译:Yellowstone Club是一个15,200英亩的私人住宅区,坐落在落矶山脉的中心地带。其中最新的添加之一是独家独特的黄石俱乐部村里核心,包括五种结构,提供豪华住宅,滑雪设施和私人滑雪俱乐部通道,以及独特的设施和聚会空间。这个高端目的地的设计人员最初被认为是一种铸造的设计。然而,最终选择总结构预制混凝土溶液以加速构造并提供更耐用的结构集。利用仿真设计将项目从就地转换为预制混凝土,设计师能够从施工时间表中24个月切割,让他们在一年内完成该项目。为了满足攻击性时间表,利益攸关方通过四个季节促进了快速追踪的时间表。整个项目,工人争夺极端天气和几个严重的冻融周期。

著录项

  • 来源
    《PCI Journal》 |2020年第3appa期|52-52|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号