...
首页> 外文期刊>Philippine Architecture, Engineering & Construction Record >P146-M bridge designed to solve flooding in 2 Bataan towns
【24h】

P146-M bridge designed to solve flooding in 2 Bataan towns

机译:P146-M桥旨在解决巴丹2个城镇的洪水

获取原文
获取原文并翻译 | 示例
           

摘要

A multimillion-peso bridge in northern Bataan that remains unfinished was initially seen as the solution to the perennial flooding in Hermosa and neighboring Dinalupihan towns and was a result of years of study, said a top Department of Public Works and Highways (DPWH) officer here.rnDPWH district engineer Willy Mallari said the Palihan Bridge project in barangay Palihan, Hermosa, with a project cost of P146 million, remains incomplete and is now causing traffic in the area.
机译:公共工程和公路部高级官员在此表示,巴丹北部一座数百万比索的桥梁仍未完工,最初被视为解决赫尔摩萨及邻近的迪纳鲁皮汗城镇常年洪水的方法,也是多年研究的结果。 .rnDPWH地区工程师Willy Mallari表示,位于埃莫萨州Barangay Palihan的Palihan Bridge项目的工程造价为1.46亿比索,目前仍未完成,目前正在该地区引起交通拥堵。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号