首页> 外文期刊>Pipe line & gas industry >J-lay addition, DP upgrade equips SSCV for ultra-deepwater pipelay
【24h】

J-lay addition, DP upgrade equips SSCV for ultra-deepwater pipelay

机译:J型铺设,DP升级为超深水管道铺设装备了SSCV

获取原文
获取原文并翻译 | 示例
           

摘要

Industry's largest J-lay tower has been added to Saipem 7000 (S7000), enabling the semisub-mersible crane vessel (SSCV) to perform ultra-deepwater pipe line installations in 6,600-ft water depths and greater. Weighing over 6,000 tons, the tower is nearly 430 ft tall, and incorporates three conventional track-type tensioners. Each tensioner has a 175-ton capacity between welding station and non-destructive test (NDT) station. Two friction clamps, outfitted with 550-ton-capacity clamping units, apply the necessary tension.
机译:Saipem 7000(S7000)已添加了业界最大的J型塔,这使半潜式起重机船(SSCV)能够在6,600英尺及更高的水深处进行超深水管道安装。该塔重达6,000吨,高近430英尺,并装有三个传统的履带式张紧器。每个张紧器在焊接站和无损检测(NDT)站之间的重量均为175吨。两个配有550吨夹紧装置的摩擦钳可施加必要的拉力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号