...
【24h】

TECH NOTES

机译:技术备注

获取原文
获取原文并翻译 | 示例
           

摘要

With crude production rising quickly in the Permian Basin, a midstream pipeline company required an upgrade in available motor brake horsepower to enable the higher forecasted flow rates. However, constructing additional facilities, including motors and pumps, would mean significant capital investment and require long lead times. Before making this major decision, the company invited Optum analyzed the client's crude properties, pump performance curves and pipeline operational data. The system was a 16-inch pipeline, 49 miles in length and transporting 39 API gravity. The pump station operated two pumps in series, one with a variable-frequency drive (VFD).
机译:在二叠纪盆地迅速上升的粗产量,中游管道公司需要在可用的电动机制动器马力升级,以实现更高的预测流量。然而,构建额外设施,包括电机和泵,意味着大量资本投资,需要长时间的交付时间。在进行这一重大决定之前,该公司邀请OPTUM分析了客户的原油属性,泵性能曲线和管道运营数据。该系统是16英寸的管道,长度为49英里,运输39 API重力。泵站串联操作了两个泵,一个带有变频驱动器(VFD)。

著录项

  • 来源
    《Pipeline & gas journal》 |2018年第5期|71-71|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号