The Ohio Power Siting Board (OPSB) approved a route for Duke Energy's Central Corridor natural gas pipeline.The decision comes after a review of the company's application, and evidentiary and public hearings about the 14-mile natural gas pipeline.In its ruling, the OPSB concluded the best route for the Central Corridor distribution pipeline is the proposed western or alternate route that runs through southwestern Ohio."The board...finds that the need for the project has been demonstrated based on the need to retire the aged and outdated propane-air facilities. The record, however, also reflects that the [pipeline] will improve the north/south system supply balance, which we find is further evidence of need," the board said in its order.The pipeline will connect an existing Duke Energy Ohio pipeline near the intersection of Butler, Warren and Hamilton counties with an existing company pipelinein the Norwood area."The OPSB's certificate to construct this critical infrastructure is an important milestone for the Central Corridor Pipeline, and we thank the board for its thorough review of this project," said Amy Spiller, president, Duke Energy Ohio and Kentucky.
机译:俄亥俄州电力选址板(OPSB)批准了Duke Energy的中央走廊天然气管道的路线。该决定审查了本公司的申请,以及关于14英里天然气管道的证据和公开听证会。在其裁决中,OPSB总结了中央走廊分配管道的最佳路线是俄亥俄州西南部贯穿的拟议的西方或替代路线。“董事会......发现,已经证明了该项目的需求是根据退休的衰老和过时的丙烷空气设施的必要性。然而,记录也反映了[管道]将改善北/南系统我们发现的供应平衡是进一步的需要的证据,“董事会在其订单中表示。管道将与现有公司管道的巴特勒,沃伦和汉密尔顿县交汇处连接现有的公爵能源俄亥俄州管道在诺伍德地区。“OPSB构建这个关键基础设施的证书是中央走廊管道的重要里程碑,我们感谢董事会对该项目进行全面审查,”杜克能源俄亥俄州和肯塔基州艾米尖船说。

著录项

  • 来源
    《Pipeline & gas journal》 |2020年第1期|1214|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号