...
首页> 外文期刊>Pipeline & gas journal >DTE Energy Finds Communication a Key in Replacement Effort
【24h】

DTE Energy Finds Communication a Key in Replacement Effort

机译:DTE Energy发现通信是替代工作的关键

获取原文
获取原文并翻译 | 示例
           

摘要

When it comes to huge long-term infrastructure replacement programs, few equal that of DTE Energy's ongoing effort in Michigan. Not only is the service territory massive -20,000 square miles spread across the state -there is also the not-so simple matter of trying to upgrade 20,000 copper gas meters annually. "Many of the meters we are changing are still located within the home or business and are being moved to an exterior wall of the building," said Joi Harris, vice president of gas operations at DTE told P&GJ in a recent interview. "The work inside takes two to three hours, so we have to arrange for someone who is an adult to be inside during that time."
机译:当涉及到大型的长期基础设施更换计划时,几乎没有什么能与DTE Energy在密歇根州正在进行的努力相提并论。服务范围不仅遍及全州-20,000平方英里,而且还不那么简单,每年尝试升级20,000铜燃气表。 DTE天然气业务副总裁Joi Harris在最近的一次采访中对P&GJ表示:“我们正在更换的许多仪表仍位于房屋或企业内部,并且正在移至建筑物的外墙。” “内部的工作需要两到三个小时,因此我们必须安排一个成年人陪同在那儿。”

著录项

  • 来源
    《Pipeline & gas journal》 |2017年第9期|18-21|共4页
  • 作者

    Michael Reed;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号