Based in Queensland, Australia, the GLNG project involves gas field developments in southeast Queensland and an LNG plant on Curtis Island, near Gladstone. Sanctioned in January 2011, GLNG includes the development of coal seam gas (CSG) resources in the Bowen and Surat Basins, construction of a 420-km underground gas transmission pipeline to Gladstone, and two LNG trains with a combined nameplate capacity of 7.8 mtpa on Curtis Island. The project has an estimated gross capital cost of US$18.5 billion and is on track for first LNG in the second half of 2015. The project is being developed by a joint venture made up of Santos, Total, Petronas and Kogas. The contract involving engineering, procurement and construction of the 420-km, 42-inch gas transmission pipeline and fiber optic communications running from Fairview to Curtis Island was awarded in 2011 to Saipem Australia.
机译:GLNG项目位于澳大利亚昆士兰州,涉及昆士兰州东南部的气田开发和位于Gladstone附近的柯蒂斯岛的LNG工厂。 GLNG于2011年1月获得批准,其中包括在Bowen和Surat盆地开发煤层气(CSG)资源,建设通往Gladstone的420公里地下输气管道以及两辆LNG火车,其铭牌总容量为7.8 mtpa。柯蒂斯岛。该项目的总资本成本估计为185亿美元,并有望在2015年下半年投入首批液化天然气。该项目由桑托斯,道达尔,马来西亚国家石油公司和Kogas组成的合资企业开发。该合同涉及从Fairview到Curtis岛的420公里,42英寸长的输气管道和光纤通信的工程,采购和建设,于2011年授予了Saipem Australia。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号