...
首页> 外文期刊>Pipeline & gas journal >Integrys Replacing Aging Chicago Distribution System
【24h】

Integrys Replacing Aging Chicago Distribution System

机译:替换陈旧的芝加哥分销系统

获取原文
获取原文并翻译 | 示例
           

摘要

With about 2,000 miles of cast iron mains to replace within its Peoples Gas distribution system, Integrys Energy Group would be facing a huge job, even in the friendliest of environments. That the work is taking place in one of the most densely populated cities in the United States - Chicago - and involves replacing about 300,000 services pipes and related meters, increases the degree of difficulty substantially. "Replacing the remainder of the cast iron in our system means we are essentially installing about half of our system as brand new within 20 years," said Bill Morrow, executive vice president of the Integrys gas division.
机译:Integrys能源集团将在其Peoples Gas配电系统中更换约2,000英里的铸铁干线,即使在最友好的环境中也将面临巨大的工作。这项工作是在美国人口最稠密的城市之一芝加哥进行的,涉及更换约300,000条服务管道和相关仪表,极大地增加了难度。 Integrys天然气事业部执行副总裁Bill Morrow表示:“在我们的系统中更换其余的铸铁意味着我们将在20年内安装大约一半的全新系统。”

著录项

  • 来源
    《Pipeline & gas journal》 |2014年第9期|22-24|共3页
  • 作者

    Michael Reed;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号