No-Dig Anode Installation Process: A More Efficient Way To Meet CWO Compliance

机译:免挖阳极安装过程:满足CWO法规要求的更有效方法

获取原文
获取原文并翻译 | 示例
           

摘要

No-Dig Anode Installation, or NDAI, is a patented process that allows utility companies to install one or more 17-pound anodes on steel services and mains through existing valve box test stations or curb valve boxes. The entire process, which was collaboratively developed between ULC Pipeline Robotics and the Con Edison Company of New York, can be performed without the need to excavate - eliminating costly street opening permits and heavy construction equipment.
机译:无挖泥阳极安装或NDAI是一项获得专利的工艺,允许公用事业公司通过现有的阀箱测试站或路缘阀箱在钢服务和总管上安装一个或多个17磅重的阳极。由ULC Pipeline Robotics与纽约Con Edison Company合作开发的整个过程无需挖掘即可完成-消除了昂贵的街道开放许可和重型建筑设备。

著录项

  • 来源
    《Pipeline & gas journal》 |2013年第4期|97-97|共1页
  • 作者

    Gas Journal;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号