...
首页> 外文期刊>Pipeline & gas journal >Inline Inspection Confirms Integrity Of E.ON UK Pipeline
【24h】

Inline Inspection Confirms Integrity Of E.ON UK Pipeline

机译:在线检查确认E.ON UK管道的完整性

获取原文
获取原文并翻译 | 示例
           

摘要

TD. Williamson UK (TDW) recently completed an inline inspection operation for E.ON UK. The operation on the Blyborough to Cottam pipeline follows closely on the heels of an April 2011 inspection of a line stretching from Burton Point AGI to Connah's Quay Power Station. That operation was especially delicate, given the proximity of an important nature reserve. The latest operation involved a 24-inch pipeline which transports natural gas from the National Grid Gas Blyborough NTS junction through E.ON UK's Blyborough installation to a pressure-reduction center at the Cottam Power Station in England. The pipeline then delivers gas to the Cottam Development Center (CDC). In total, the pipeline stretches 23.4 km.
机译:TD。英国威廉姆森(TDW)最近完成了对E.ON UK的在线检查操作。 Blyborough至Cottam管道的运营紧随2011年4月对从Burton Point AGI延伸至Connah的Quay电站的一条管线的检查之后。鉴于附近有重要的自然保护区,该操作特别棘手。最新的操作涉及一条24英寸的管道,该管道将天然气从国家电网天然气布利伯勒NTS交界处通过E.ON UK的布利伯勒设施运送到英格兰科塔姆电站的减压中心。然后,管道将天然气输送到Cottam开发中心(CDC)。管道全长23.4公里。

著录项

  • 来源
    《Pipeline & gas journal》 |2012年第3期|p.114|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号