...
首页> 外文期刊>Pipeline & gas journal >DCP Midstream To Double Capacity In Denver-Julesburg Basin
【24h】

DCP Midstream To Double Capacity In Denver-Julesburg Basin

机译:丹佛-尤尔斯堡盆地DCP中游产能翻番

获取原文
获取原文并翻译 | 示例
           

摘要

DCP Midstream LLC reports capital investments under way will double its processing capacity in the Denver-Julesburg Basin by the end of 2014. As producers move more drilling rigs into basins where new technology is significantly increasing natural gas production, DCP has a strategy under way to build a one-stop services company to offer integrated solutions to its customers - including gathering, processing, natural gas liquids (NGL) transportation and fractionation services. 80,82 Colonial Completes Expansion Of Distillate Mainline Colonial Pipeline announced completion on July 31 of the final phase of a 75,000 bpd increase to the capacity of its primary distillate pipeline, which originates in Houston and serves the Southern and Eastern U.S. The previously announced project was accomplished through the enhancement of pumps, motors and existing operations at 17 Colonial locations but did not require laying additional pipe, Colonial CEO Tim Felt said in announcing the 15-month project's completion.
机译:DCP Midstream LLC报告称,正在进行的资本投资将在2014年底之前将其在丹佛-祖尔斯堡盆地的处理能力提高一倍。随着生产商将更多的钻机转移到新技术显着提高天然气产量的盆地中,DCP正在实施一项战略,以建立一站式服务公司,为客户提供集成解决方案-包括收集,加工,天然气液体(NGL)运输和分馏服务。 80,82殖民地公司完成了馏分油主干线的扩建殖民地管线于7月31日宣布,其主要馏分油管道的产能增加75,000桶/天的最后阶段完工,该主要馏分油管道起源于休斯敦,为美国南部和东部提供服务。殖民地首席执行官蒂姆·菲尔特(Tim Felt)在宣布为期15个月的项目完工时说,它通过改善殖民地17个地点的泵,电动机和现有运营而完成,但不需要铺设额外的管道。

著录项

  • 来源
    《Pipeline & gas journal》 |2012年第9期|8082|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号