...
首页> 外文期刊>Pipeline & gas journal >Weatherford Helps Cut Commissioning Costs In Deepwater Field Off Ghana
【24h】

Weatherford Helps Cut Commissioning Costs In Deepwater Field Off Ghana

机译:Weatherford帮助削减加纳深水油田的调试成本

获取原文
获取原文并翻译 | 示例
           

摘要

Weatherford Pipeline & Specialty Services group was awarded a contract by Technip for pre-commissioning and commissioning services on the Jubilee field development off West Africa.rnThe contract covers pigging of production, water and gas injection flowlines; hydrostatic testing of the flowlines, riser and jumpers; and dewatering of the gas-injection system. During installation and post installation, Weatherford will perform electrical and pressure monitoring and testing of the umbilicals from the floating, production, storage, and offloading (FPSO) vessel.
机译:Weatherford Pipeline&Speciality Services Group被Technip授予了西非Jubilee油田开发的预调试和调试服务的合同。该合同涉及生产,注水和注气生产线的清管;出水管线,立管和跨接的静水压测试;和注气系统的脱水。在安装和安装后的过程中,Weatherford将对浮式,生产,储存和卸载(FPSO)容器中的脐带进行电气和压力监测和测试。

著录项

  • 来源
    《Pipeline & gas journal》 |2010年第4期|p.93-94|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号