首页> 外文期刊>Pipeline & gas journal >HDD Solves Pipeline Relocation In Venice Canal
【24h】

HDD Solves Pipeline Relocation In Venice Canal

机译:HDD解决了威尼斯运河中的管道搬迁问题

获取原文
获取原文并翻译 | 示例
           

摘要

LMR Drilling GmbH realized the crossing with safety, fully respecting the timeline and overcoming any logistic and operational difficulties by correctly using the directional drilling technique. A proper design of the route and an adequate choice of the drilling tools allowed a precise, speedy and successful crossing of the canal with full satisfaction of the client. Great help was derived through the use of an accurate steering system based on the gyroscope device which allowed correct guidance in the presence of highly magnetic fields. In fact, thanks to the perfect steering and drilling, the pilot punch-out was less than 20 inches from the target peg.
机译:LMR Drilling GmbH通过正确地使用定向钻井技术,安全地实现了穿越,充分遵守了时间表并克服了任何后勤和操作上的困难。正确的路线设计和适当的钻探工具选择,可以使客户精确,快速,成功地穿越运河,并使客户完全满意。通过使用基于陀螺仪设备的精确转向系统获得了很大的帮助,该系统可以在存在强磁场的情况下进行正确的引导。实际上,得益于完美的操纵和钻孔,飞行员的打孔距离目标钉不到20英寸。

著录项

  • 来源
    《Pipeline & gas journal》 |2010年第7期|P.2224-25|共3页
  • 作者单位

    LMR Drilling GmbH;

    rnLMR Drilling GmbH;

    rnLMR Drilling GmbH;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号