...
首页> 外文期刊>Pipeline & gas journal >The TM (Ten-Minute) Tap Removal System
【24h】

The TM (Ten-Minute) Tap Removal System

机译:TM(十分钟)丝锥拆卸系统

获取原文
获取原文并翻译 | 示例
           

摘要

The process of removing old clamp-on gas service tees is long and tedious, taking a four man crew a minimum of three hours to complete; that's three hours or more for each removal. There are several steps involved in this process, and in the event that service can't be interrupted downstream, a bypass has to be installed.rnA half-stop is welded on each side of the tap that is being removed to control the flow of gas and a bypass hose is added. Once the bypass is operational, the service connection is removed; a patch is welded over the tap site, or a cylinder of pipe is welded in place.
机译:拆除旧的固定式燃气服务三通的过程很漫长而乏味,需要四名人员最少三个小时才能完成。每次删除需要三个小时或更长时间。此过程涉及多个步骤,如果下游不能中断维修,则必须安装旁路。rn在要拆卸的水龙头的每一侧焊接一个半挡块,以控制水流。气体并添加了旁路软管。旁路可操作后,服务连接将被删除;在分接位置上焊接补片,或在适当位置焊接圆柱管。

著录项

  • 来源
    《Pipeline & gas journal》 |2009年第5期|84-85|共2页
  • 作者

    Ricky Halverson;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号