...
首页> 外文期刊>Pipeline & gas journal >Has A Court Stopped Pipeline Construction?
【24h】

Has A Court Stopped Pipeline Construction?

机译:法院是否停止了管道建设?

获取原文
获取原文并翻译 | 示例
           

摘要

New natural gas pipeline construction is at risk of a standstill. A U.S. District Court in Arizona rejected a natural gas company's right of immediate possession of the property necessary to begin construction before the federal condemnation process is complete.rnThe court's decision in Transwestern Pipeline Company, LLC v. Various Tracts of Land, requires the pipeline company to wait until the amount of just compensation is determined and paid before it begins construction of its pipeline on any property that is in dispute. This is one of the first courts to take this position despite a long line of cases led by the U.S. Court of Appeals for the Fourth Circuit's decision in Sage v. East Tennessee Natural Gas. Does this signal a change in the law or is this simply one court that got it wrong?rnThe Natural Gas Act gives interstate natural gas companies the federal power of eminent domain to condemn the easements necessary to construct new facilities. That Act, however, does not specifically provide the gas companies with immediate use and possession of the properties so that construction can begin soon after the issuance of a certificate of public convenience and necessity from the Federal Energy Regulatory Commission (FERC). Natural gas companies have-long used the equitable powers of the federal courts as the avenue to gain immediate access to the property. Without access to the property, construction cannot begin.
机译:新的天然气管道建设有停滞的危险。亚利桑那州的美国地方法院拒绝了天然气公司对在联邦谴责程序完成之前开始建筑所需财产的立即拥有权。rn法院在Transwestern Pipeline Company,LLC诉Land of Tracts of Land案中的判决要求管道公司等待,直到确定并支付了公正的赔偿额,然后才开始对有争议的财产建造管道。尽管美国上诉法院针对第四巡回法院在Sage诉East Tennessee Natural Gas案中的裁决牵头处理了许多案子,但该法院还是首个采取这一立场的法院之一。这是否表明法律发生了变化,或者仅仅是一个错了的法院?《天然气法》赋予州际天然气公司以联邦统治权,以谴责建造新设施所必需的地役权。但是,该法案并未专门为燃气公司提供立即使用和拥有这些物业的权利,因此,在联邦能源监管委员会(FERC)颁发公共便利和必要性证明后,便可以立即开始施工。天然气公司长期以来一直使用联邦法院的平等权力作为立即进入该物业的途径。如果无法使用该物业,则无法开始施工。

著录项

  • 来源
    《Pipeline & gas journal》 |2008年第7期|48-49|共2页
  • 作者

    Lela M. Hollabaugh;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号