...
首页> 外文期刊>Pipeline & gas journal >Pipeline Operators Face New Hurdles Ranging From Project Delivery To Carbon Regulation
【24h】

Pipeline Operators Face New Hurdles Ranging From Project Delivery To Carbon Regulation

机译:管道运营商面临着从项目交付到碳管制的新障碍

获取原文
获取原文并翻译 | 示例
           

摘要

Gary Adams, Vice Chairman of Oil & Gas at Deloitte, recently assembled a panel of leading Deloitte consultants to discuss the hurdles facing the midstream business. He prefaced the discussion thusly: "Today's operators have to contend with everything from increasing costs for materials and labor to stringent new regulatory requirements. To explore these issues, we convened a group of our top practitioners, asking them to provide real-world advice based on Deloitte's work with dozens of oil and gas companies."
机译:德勤石油与天然气副董事长加里·亚当斯(Gary Adams)最近组建了一个由德勤领先的顾问组成的小组,讨论中游业务面临的障碍。他因此开始讨论:“当今的运营商必须应对从材料和人工成本增加到严格的新法规要求等各种问题。为探讨这些问题,我们召集了一批顶级从业人员,请他们根据实际情况提供建议。关于德勤与数十家石油和天然气公司的合作。”

著录项

  • 来源
    《Pipeline & gas journal》 |2008年第10期|32-35|共4页
  • 作者

    Deloitte Roundtable;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号