...
【24h】

Government

机译:政府

获取原文
获取原文并翻译 | 示例
           

摘要

Interstate gas transmission companies are hoping the Federal Energy Regulatory Commission (FERC) gives electric peaking utilities new leeway to recapture high gas costs they are forced to pay when their Independent System Operators (ISOs) and Regional Transmission Organizations (RTOs) suddenly demand those peaking generators be brought into play on 24-hour notice on very cold or very hot days. The inquiry FERC announced in October follows on the heels of new cost capture freedom FERC gave electric generators in New England based on a request for pricing changes submitted by ISO New England Inc. (ISO-NE) and the New England Power Pool (NEPOOL).
机译:州际间的输气公司希望联邦能源监管委员会(FERC)为电调峰公用事业提供新的回旋余地,以收回独立系统运营商(ISO)和区域输电组织(RTO)突然要求这些调峰发电机被迫支付的高昂的天然气费用在非常寒冷或非常炎热的天气中,会在24小时通知中发挥作用。 FERC于10月宣布了询价,紧随新成本节约自由之后,FERC根据ISO New England Inc.(ISO-NE)和New England Power Pool(NEPOOL)提交的价格变动要求,向新英格兰的发电机提供了费用。

著录项

  • 来源
    《Pipeline & gas journal》 |2007年第1期|p.8|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道运输;煤炭气化工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号