...
首页> 外文期刊>Pipeline & gas journal >Pacific Trail Pipelines Seeks Approval For 290-Mile Pipeline
【24h】

Pacific Trail Pipelines Seeks Approval For 290-Mile Pipeline

机译:Pacific Trail管道寻求批准290英里管道

获取原文
获取原文并翻译 | 示例
           

摘要

Pacific Trail Pipelines Limited Partnership has filed an application for an Environmental Assessment Certificate for the proposed Kitimat to Summit Lake Pipeline Looping Project (KSL Project) with the British Columbia Environmental Assessment Office. The KSL Project entails the construction of approximately 290 miles of 36-inch diameter pipeline and compression facilities as required to enable PTP to accept delivery of up to 1 Bcf/d of regasified LNG from a receiving terminal proposed by Kitimat LNG Inc.
机译:Pacific Trail Pipelines Limited Partnership已向不列颠哥伦比亚省环境评估办公室提交了拟议的Kitimat到Summit Lake Pipeline Looping Project(KSL Project)的环境评估证书的申请。 KSL项目需要建设约290英里,直径为36英寸的管道和压缩设施,以使PTP能够接受Kitimat LNG Inc.提议的接收站从再生终端接收高达1 Bcf / d的再气化LNG。

著录项

  • 来源
    《Pipeline & gas journal》 |2007年第10期|12|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道运输;煤炭气化工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号