...
首页> 外文期刊>Pipeline & gas journal >Historic East African Project Well Worth Its Challenges
【24h】

Historic East African Project Well Worth Its Challenges

机译:东非历史悠久的项目值得挑战

获取原文
获取原文并翻译 | 示例
           

摘要

One of the more impressive international projects in recent years has been the 225-km natural gas pipeline and associated power plant that was developed for the East African nation of Tanzania. The pipeline comes some 30 years after a major natural gas reservoir was discovered off the southern coast of Tanzania around Songo Songo, a small fishing island in the Indian Ocean. The pipeline connects the reserves to the power plant located farther north. The area has historically depended on hydro-electricity and fuel oil for its power generation, so the switch to natural gas is important from both an economic and environmental standpoint. The project was developed and is operated by Songas Limited, the majority owner of which is Globeleq, an operating power company targeting Africa, Latin America and Asia.
机译:近年来,最令人印象深刻的国际项目之一是为东非国家坦桑尼亚开发的225公里天然气管道和相关电厂。这条管道是在坦桑尼亚南部沿印度洋的一个小渔岛Songo Songo周围发现一个主要的天然气藏大约30年之后才进行的。管道将储量连接到更北的发电厂。从历史上看,该地区一直依靠水力发电和燃料油发电,因此从经济和环境角度来看,转向天然气都是重要的。该项目是由Songas Limited开发和运营的,Songas Limited的主要所有者是Globeleq,这是一家针对非洲,拉丁美洲和亚洲的运营电力公司。

著录项

  • 来源
    《Pipeline & gas journal》 |2005年第5期|p.2224-26|共4页
  • 作者

    Jeff Share;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道运输;煤炭气化工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号