...
首页> 外文期刊>Platts Electric Utility Week >After obtaining state water quality permit, PacifiCorp closer to tearing down dam in 2011
【24h】

After obtaining state water quality permit, PacifiCorp closer to tearing down dam in 2011

机译:在获得州水质许可证后,PacifiCorp于2011年接近拆除大坝

获取原文
获取原文并翻译 | 示例
           

摘要

About 11 years after PacifiCorp Energy reached a multi-party nsettlement to decommission rather than relicense its 14.7-MW nhydropower project in Washington, the utility has obtained one nof three water permits and certificates necessary to move ahead nwith removal of the facilities.nThe Washington Department of Ecology on October n12 issued a water quality certification to PacifiCorp, which nallows the company to seek a dredge and fill permit from the nArmy Corps of Engineers and a storm water permit from the nWashington ecology department to remove the Condit Dam nproject from the White Salmon River in Klickitat County.
机译:在PacifiCorp Energy达成多方退役解决方案而不是重新许可其位于华盛顿的14.7兆瓦水电项目的约11年之后,该公用事业公司获得了三个No.3的水许可证和证书,以便在不拆除设施的情况下继续前进。于12月10日向美国环保组织(PacifiCorp)颁发了水质认证,该证书禁止该公司向美国海军陆战队工程师团寻求挖泥和装填许可证,并向华盛顿生态学部门寻求雨水许可证,以从白鲑鱼中移除康迪特大坝项目。克里克塔特县的河。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号