...
首页> 外文期刊>Electric Utility Week >Cwlp Coal Plant Is Ahead Of Schedule; Commercial Operation Targeted For 2009
【24h】

Cwlp Coal Plant Is Ahead Of Schedule; Commercial Operation Targeted For 2009

机译:Cwlp燃煤电厂提前完成; 2009年的商业运营目标

获取原文
获取原文并翻译 | 示例
           

摘要

Unlike many US electric generators facing legal and regulatory opposition from environmentalists over plans for new coal-fired power plants, the city-owned electric system in Springfield, Illinois, quietly is forging ahead with construction of a 200-MW coal unit. And it is well ahead of schedule and on budget. Ratings agency Standard & Poor's, a subsidiary of The McGraw-Hill Companies, has taken favorable notice. Last week, City Water, Light and Power said the new generating station, Dallman Unit 4, is targeted for commercial operation in the fall of 2009 at the muni's 372-MW Dallman baseload plant. That is about half a year earlier than originally expected.
机译:与许多美国发电机在环保和环保方面就新建燃煤电厂的计划面临法律和法规上的反对意见不同,伊利诺伊州斯普林菲尔德市拥有的电力系统正在悄悄地推进200兆瓦燃煤机组的建设。而且它远远超出了计划和预算。麦格劳-希尔公司(McGraw-Hill Companies)的子公司评级机构标准普尔(Standard&Poor's)对此表示赞赏。上周,城市水,电和电力公司表示,新发电站Dallman 4号机组的目标是2009年秋季在Muni的372兆瓦Dallman基本负荷工厂中投入商业运营。这比原先的预期提前了半年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号