Nyiso Planning Process Puts A Damper On Significant Grid Build-out, Study Says

机译:研究称,Nyiso规划过程阻碍了重要的电网建设

获取原文
获取原文并翻译 | 示例
           

摘要

The potential economic and environmental benefits of new transmission investment have not yet been realized in New York, says a white paper released in November by the state's grid operator. One main reason may be that New York Independent System Operator's comprehensive reliability planning process "differs fundamentally" from its neighbors PJM Interconnection and ISO New England. "PJM and ISO-NE clearly view transmission [projects] as enablers of competitive wholesale energy markets," said the paper written by officials from NYISO and the research firm ESAI. "It is equally clear that the NYISO and its stakeholders view transmission as an equal competitor to generation and demand response." Thus, the New York process' reliance on all resources, including transmission, its preference for market-based solutions and the "compression of the timeframe for regulated backstop solutions make it less likely that transmission will be chosen as a solution to address reliability needs in New York," according to the paper. Under the planning process, once NYISO identifies a reliability need it first seeks market solutions. If none emerge, a designated transmission owner is responsible for a regulated backstop solution. That is very different from PJM and ISO-NE, where transmission expansion booms are being driven by planning processes that are geared toward resolving expected violations of reliability criteria, the paper noted. In fact, market solutions are proposed and being developed to fully meet reliability needs identified through 2013 in NYISO's comprehensive reliability plan.
机译:纽约州电网运营商在11月发布的一份白皮书中说,新输电投资的潜在经济和环境效益尚未在纽约实现。一个主要原因可能是纽约独立系统运营商的全面可靠性计划流程与邻国PJM互连和ISO新英格兰地区“根本不同”。 NYISO和研究公司ESAI的官员说:“ PJM和ISO-NE清楚地将传输[项目]视为竞争性批发能源市场的推动者。” “同样清楚的是,NYISO及其利益相关者将输电视为发电和需求响应的平等竞争者。”因此,纽约流程对包括传输在内的所有资源的依赖,对基于市场的解决方案的偏爱以及“受管制的后备解决方案的时限压缩”,使得选择传输作为满足以下方面可靠性需求的解决方案的可能性较小。纽约”。在计划过程中,NYISO一旦确定了可靠性需求,便会首先寻求市场解决方案。如果没有出现,则由指定的变速箱所有者负责受监管的逆止器解决方案。该论文指出,这与PJM和ISO-NE截然不同,在PJM和ISO-NE中,传输扩展热潮是由旨在解决预期的违反可靠性标准的规划过程驱动的。实际上,已经提出并正在开发市场解决方案,以完全满足NYISO全面可靠性计划中确定的至2013年的可靠性需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号