...
首页> 外文期刊>Electric Utility Week >Opponents of Dominion line applaud Virginia decision to reopen case record
【24h】

Opponents of Dominion line applaud Virginia decision to reopen case record

机译:Dominion生产线的反对者为弗吉尼亚州决定重开案件记录表示赞赏

获取原文
获取原文并翻译 | 示例
           

摘要

Opponents of the Trans-Allegheny Interstate Line last week applauded the decision by a Virginia hearing examiner to reopen the record to allow in new information. Dominion Virginia must present new generation and load flow data before a ruling can be made on the need for the 200-mile, 500-kV line, hearing examiner Alexander Skirpan said. Opponents of the line had asked for information on how American Electric Power's proposed Potomac Appalachian Transmission Highline, more commonly called the Path, a 290-mile mostly 765-kV line from St. Albans, West Virginia, to the Kemptown substation south of Frederick, Maryland, would affect the need for the Trans-Allegheny line. The Path line would come into service one year after the Trans-Allegheny Line.
机译:跨阿勒格尼州际运输线的反对者上周对弗吉尼亚州听证官的决定表示欢迎,他决定重新开放唱片以允许提供新信息。听力检查员亚历山大·斯基潘(Alexander Skirpan)表示,在确定是否需要200英里,500 kV线路之前,Dominion Virginia必须提供新一代和潮流数据。该线路的反对者要求提供有关美国电力公司拟议的波托马克阿巴拉契亚输电高架线(通常称为路径)的信息,该线路是一条从西弗吉尼亚州圣奥尔本斯到弗雷德里克以南的肯普敦变电站的290英里(长765kV)的线路,马里兰州将影响对跨阿勒格尼线的需求。 Path线将在Trans-Allegheny线后一年投入服务。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号