...
首页> 外文期刊>Electric Utility Week >Progress takes $54 million impairment charge on synfuels, and Teco Energy halts production
【24h】

Progress takes $54 million impairment charge on synfuels, and Teco Energy halts production

机译:Progress为合成燃料计入了5,400万美元的减损费,Teco Energy暂停了生产

获取原文
获取原文并翻译 | 示例
           

摘要

With high oil prices pointing to the end — or at least sharp cutbacks — in synthetic fuels tax credits this year, Progress Energy last week booked a $54 million (after tax) charge against second-quarter earnings to write off the entire asset carrying value of its synfuels manufacturing facilities, as well as part of the value of the river terminals at which the synfuels manufacturing facilities are located.
机译:由于高油价指出了今年合成燃料税收抵免的目的,或者至少是大幅削减,Progress Energy上周从第二季度收益中扣除了5400万美元的税后费用,以冲销该公司的全部资产账面价值。其合成燃料生产设施,以及合成燃料生产设施所处河港价值的一部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号