...
首页> 外文期刊>Power in Europe >Power in Europe’s new plant tracker
【24h】

Power in Europe’s new plant tracker

机译:欧洲新工厂追踪器的强大功能

获取原文
获取原文并翻译 | 示例
           

摘要

Polish utilities Energa and Enea suspended financing of the 1 GW coalplant project on February 13 pending new analysis of its viability.Energa gave contractors GE Power and Alstom Power Systems noticeto proceed in December 2018.Since then, however, the utilities have struggled to attract finance,forcing suspension of plant and railway infrastructure construction.Discouraging developments included the European InvestmentBank’s new lending policy, focused exclusively on low or zero carbontechnology, and the European Commission’s Green Deal, aiming toreach a climate-neutral Europe by 2050. Furthermore, in Decemberrefiner PKN Orlen made an offer for 100% of Energa’s shares. It isopposed to coal-fired generation and has said it would convert theproject to gas.
机译:波兰电力公司Energa和Enea于2月13日暂停了1 GW燃煤电厂项目的融资,等待对其可行性进行新的分析.Energa通知承包商GE Power和Alstom Power Systems将于2018年12月继续进行,但自那时以来,电力公司一直在努力筹集资金令人鼓舞的事态发展包括欧洲投资银行的新贷款政策(专门针对低碳或零碳技术)以及欧盟委员会的绿色协议,旨在到2050年实现气候中和的欧洲。此外,在12月的炼油厂PKN Orlen提出要约收购Energa 100%的股份。它与燃煤发电相反,并表示将把该项目转换为天然气。

著录项

  • 来源
    《Power in Europe》 |2020年第818期|10-40|共31页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号