...
首页> 外文期刊>Power in Europe >UK’s 1.2 GW Dogger Bank C offshore wind project signs PPAs with trading firms
【24h】

UK’s 1.2 GW Dogger Bank C offshore wind project signs PPAs with trading firms

机译:英国的1.2 GW Dogger Bank C海上风项目与贸易公司签署PPA

获取原文
获取原文并翻译 | 示例
           

摘要

Equinor and SSE Renewables have signed 15-year Power PurchaseAgreements for 6 TWh/year from the 1.2 GW Dogger Bank offshorewind farm, the project partners said Nov. 24.Danske Commodities will have trading and balancing responsibilityfor 480 MW, while Centrica Energy Marketing and Trading, Shell EnergyEurope and SSE Energy Supply will have responsibility for 240 MW each.“Concluding offtake Power Purchase Agreements with some of theleading energy trading companies for Dogger Bank C means we arewell on track to reach financial close for the third phase of DoggerBank Wind Farm by the end of the year,” project director at SSERenewables Steve Wilson said.
机译:Equinor和SSE可再生能源已签署15年的电力购买 从1.2 GW Dogger Bank离岸的6 TWH /年的协议 该项目Partners表示风电场11月24日。 丹麦商品将有交易和平衡责任 对于480兆瓦,而中心营销和交易,壳牌能源 欧洲和SSE能源供应将负责240 MW。 “与一些人结束开关电力购买协议 用于Dogger Bank C的领先能源贸易公司意味着我们是 良好的轨道达到狗队的第三阶段的财政关闭 银行风电场到年底,“SSE项目总监 可再生能源史蒂夫威尔逊说。

著录项

  • 来源
    《Power in Europe》 |2021年第860期|34-34|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号