...
首页> 外文期刊>Power in Europe >Heat store planned for Mainz
【24h】

Heat store planned for Mainz

机译:美因茨计划的储热库

获取原文
获取原文并翻译 | 示例
           

摘要

Heizkraftwerk Mainz, a subsidiary of Stadtwerke Mainz (66.6%) and Kraftwerke Mainz Wiesbaden KMW (33.3%), is planning a large district heating water store with an electricity-powered heater in the industry park at Ingelheimer Aue in preparation for a change to district heating procurement from 2015.In just over two years, the current gas supply contract for KMW's 406-MWe cogeneration CCGT power station at Ingelheimer Aue expires.After that, the CCGT, "which has for many years been the backbone of the Mainz district heating system," will no longer be in operation for almost the whole year but rather will only operate in peak and middle load for 1,000-3,000 hours per year, the Stadtwerke said.
机译:Stadtwerke Mainz(66.6%)和Kraftwerke Mainz Wiesbaden KMW(33.3%)的子公司Heizkraftwerk Mainz正计划在Ingelheimer Aue的工业园区内建设一个大型区域热水储藏室,并配备电动加热器。从2015年开始采暖。两年多来,KMW位于英格海默(Ingelheimer Aue)的406兆瓦(MW)热电联产CCGT电站的天然气供应合同到期。 Stadtwerke说,“该系统几乎将不再全年运行,而是每年仅在高峰和中等负荷下运行1,000-3,000小时。”

著录项

  • 来源
    《Power in Europe》 |2012年第636期|p.14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号