...
首页> 外文期刊>Power in Europe >Estover submits biomass plans
【24h】

Estover submits biomass plans

机译:Estover提交生物质计划

获取原文
获取原文并翻译 | 示例
           

摘要

Estover Energy has submitted a planning application to Northumberland County Council for an upto-25-MWe biomass-fired combined heat and power plant at Windmill Industrial Estate, Cramlington. The plant is to supply power to the grid and heat and power to Aesica Pharmaceuticals, Estover said late September. It is to use clean low-grade wood from local forestry operations. A consortium of forestry owners within a 60-mile radius of the plant is to supply sufficient low-grade wood on a sustainable basis, typically low grade wood unsuitable for sawmills and timber production. Newcastle-based planning consultancy Fairhurst is working with Estover Energy.
机译:Estover Energy已向诺森伯兰郡议会提交了计划申请,申请在Cramlington的Windmill工业区使用25MWe的生物质燃料联合热电厂。 Estover 9月下旬表示,该工厂将向电网供电,并向Aesica Pharmaceuticals供热。将使用当地林业生产的干净低等级木材。在工厂半径60英里范围内的一个林业所有者联盟将以可持续的方式提供足够的低等级木材,通常是不适合锯木厂和木材生产的低等级木材。总部位于纽卡斯尔的规划咨询公司Fairhurst正在与Estover Energy合作。

著录项

  • 来源
    《Power in Europe》 |2012年第636期|p.18-19|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号