BKW subsidiary Sol-E Suisse has begun construction of a biogas power station in canton Ticino. Biogas Piano di Magadino is sited in the industrial area of Cadenazzo, will cost CHF 3.3 (€2.4) million and is set for commissioning at the end of the year.
展开▼
机译:BKW子公司Sol-E Suisse已开始在提契诺州建设沼气发电站。 Biogas Piano di Magadino坐落在Cadenazzo工业区,耗资3.3瑞士法郎(2.4欧元),计划于年底调试。
展开▼