Direct Energie has said it expects to begin construction of a gas-fired combined cycle 892-MW plant at Hambach in northeastern France next year. Construction will take three years and cost more than €700 million.rnThe key factor in the announcement is the issue of the operating licence issued by the Prefect of the Department of the Moselle, which is the final building block in the permitting process.rnDirect Energie says the plant will be "exemplary and unique in France in terms of respect for the environment and the quality of the air and water," because the government (via the Prefect) has imposed requirements that go beyond the statutory minimum.
机译:Direct Energie表示,预计明年将在法国东北部的Hambach开始建造燃气联合循环892兆瓦的发电厂。建设将耗时三年,耗资超过7亿欧元.rn公告中的关键因素是颁发摩泽尔省州长颁发的经营许可证,这是许可证审批过程中的最后一个组成部分。他说,该工厂将“在尊重环境以及空气和水的质量方面在法国具有示范性和独特性”,因为政府(通过行政长官)提出的要求超出了法定最低要求。

著录项

  • 来源
    《Power in Europe》 |2010年第12期|P.12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号