...
首页> 外文期刊>Power in Europe >SFI sets sights on mega nuclear forgings
【24h】

SFI sets sights on mega nuclear forgings

机译:SFI着眼于大型核锻件

获取原文
获取原文并翻译 | 示例
           

摘要

UK engineering company Sheffield Forgemasters International is moving ahead with plans to seek financing for a 15,000-metric-ton press that could start to produce ultra-large forgings for the nuclear industry within three years, according to a company executive. The massive press would be installed at SFI's 64-acre Brightside Lane manufacturing site in Sheffield, South Yorkshire. The equipment would put SFI in direct competition with Japan Steel Works, the developed world's monopoly supplier of ultra-large forgings, requiring ingots of 350 metric tons to 600 mt. SFI group director Peter Birtles said: "If we were to place an order with our currently preferred supplier today, the press could be working in October 2010." He said SFI had set a deadline of the end of May to decide the best way to fund the project.
机译:英国工程公司谢菲尔德国际铸造大师协会(Sheffield Forgemasters International)正在推进计划,寻求为一台15,000公吨压力机寻求融资,该压力机可能在三年内开始为核工业生产超大型锻件。这台大型压力机将安装在SFI位于南约克郡谢菲尔德的64英亩Brightside Lane制造厂。该设备将使SFI与日本钢铁厂直接竞争,日本钢铁厂是发达国家的超大型锻件垄断供应商,需要350吨至600公吨的铸锭。 SFI集团总监Peter Birtles说:“如果今天要与我们目前首选的供应商下订单,那么印刷机可能会在2010年10月投入使用。”他说,SFI设定了5月底的截止日期,以决定资助该项目的最佳方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号