...
【24h】

Switzerland

机译:瑞士

获取原文
获取原文并翻译 | 示例
           

摘要

PiE's plant tracker shows a number of Swiss gas-fired plants on hold, but a new high-level effort to clear the way for these projects could yet see them bridge the Swiss system across a potential supply shortage before new reactors are ready.rnEnergy minister Moritz Leuenberger is expected to propose a change in the law on compensation for CO2 emissions to his cabinet colleagues before the end of the year. A federal decree adopted by parliament requiring compensation of 70% of emissions at home and 30% abroad, thus rendering CCGTs economically unfeasible, will be reviewed in the new session of parliament. Leuenberger would like the ratio to be set at 50-50.
机译:PiE的工厂追踪器显示了许多瑞士燃气工厂处于搁置状态,但为这些项目扫清道路的新的高层努力可能仍会看到它们在新反应堆准备就绪之前,将瑞士系统与潜在的供应短缺联系起来。预计莫里茨·洛恩伯格(Moritz Leuenberger)将在今年年底前向内阁同事提议一项有关CO2排放补偿的法律。议会通过的一项联邦法令要求在国内赔偿70%的排放量,在国外赔偿30%的排放量,从而使CCGT在经济上不可行,将在新一届议会中进行审查。 Leuenberger希望将比率设置为50-50。

著录项

  • 来源
    《Power in Europe》 |2008年第534期|62-63|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号