...
首页> 外文期刊>Platts Megawatt Daily >Dominion delays Atlantic Coast Pipeline startup by another year amid legal hurdles
【24h】

Dominion delays Atlantic Coast Pipeline startup by another year amid legal hurdles

机译:在法律上的障碍下,Dominion将大西洋海岸管道的启动推迟了一年

获取原文
获取原文并翻译 | 示例
           

摘要

Dominion Energy delayed initial startup of its Atlantic Coast Pipeline byanother year on Friday and boosted the expected cost by up to $500million as the natural gas project remains mired in legal challenges.The 1.5 Bcf/d pipeline is among several pieces of new infrastructurethat are intended to boost takeaway capacity from the US Northeastgas producing region. But, most of the projects have faced strongopposition from environmental groups, especially Atlantic CoastPipeline. Recent federal appeals court rulings created the latest snag, and construction is currently halted along most of the route.
机译:Dominion Energy周五将其大西洋海岸管道的初始启动推迟了 r n年,并且由于天然气项目仍陷入法律挑战中,因此将预期成本提高了500美元/ nm 3。 r n1.5 Bcf / d管道是旨在增加美国东北部 r n天然气生产地区的外卖能力的几处新基础设施中的一部分。但是,大多数项目都面临着来自环境团体的强烈反对,尤其是大西洋海岸 r nPipeline。最近的联邦上诉法院裁决造成了最新的障碍,目前沿这条路线的大部分都停止了施工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号