首页> 外文期刊>Power Delivery, IEEE Transactions on >Power Transformer Tank Rupture and Mitigation—A Summary of Current State of Practice and Knowledge by the Task Force of IEEE Power Transformer Subcommittee
【24h】

Power Transformer Tank Rupture and Mitigation—A Summary of Current State of Practice and Knowledge by the Task Force of IEEE Power Transformer Subcommittee

机译:电力变压器储罐的破裂和缓解— IEEE电力变压器小组委员会工作组的最新实践和知识总结

获取原文
获取原文并翻译 | 示例
           

摘要

Ten presentations made by members of the IEEE Task Force on Transformer Tank Rupture and Mitigation over a course of four Transformer Committee meetings have been summarized. The task force was established in 2005 with an aim to review the current state of practice and knowledge for transformer tank rupture and mitigation, as well as to determine if this issue has been adequately covered by existing IEEE standards. The mechanics of transformer tank rupture, current IEEE standards on this issue, as well as various methods for preventing or mitigating tank rupture were presented and discussed. There were 81 registered members in the Task Force. The aim of this paper is to provide a description of all existing methods and technologies to prevent or mitigate transformer tank rupture. The paper does not endorse any particular product or method.
机译:IEEE变压器罐破裂和缓解特别工作组成员在四个变压器委员会会议的过程中总结了十个演讲。该工作组成立于2005年,旨在审查有关变压器油箱破裂和缓解的实践和知识的现状,并确定此问题是否已被现有IEEE标准充分涵盖。介绍并讨论了变压器油箱破裂的机理,有关此问题的现行IEEE标准以及防止或减轻油箱破裂的各种方法。工作队中有81名注册成员。本文的目的是提供对防止或减轻变压器油箱破裂的所有现有方法和技术的描述。本文不认可任何特定的产品或方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号