Upgrading the Anglo-Scottish interconnection

机译:升级英苏格兰之间的联系

获取原文
获取原文并翻译 | 示例
           

摘要

This article is a summary of a number of papers presented at an IEE Colloquium in Glasgow on the upgrading of the power system interconnection between Scotland and England. The work involved ScottishPower, Scottish HydroElectric and National Grid Company in a multi-discipline project which, from authorisation to commissioning took 34 months, with a total investment of Pounds 125 million from the Scottish companies. The capacity of the interconnector has been increased from 850 MW to 1600 MW and this has been achieved by the integration of several complementary developments, including the construction of the longest transmission line to be built in the UK in 25 years (125 km), three new substations, two static VAr compensators (SVCs) and modifications to the excitation and automatic voltage regulators (AVRs) at three Scottish power stations.
机译:本文是在格拉斯哥举行的IEE学术讨论会上发表的有关升级苏格兰和英格兰之间的电力系统互连的大量论文的摘要。这项工作涉及ScottishPower,Scottish HydroElectric和National Grid Company的一个多学科项目,从授权到调试历时34个月,苏格兰公司的总投资为1.25亿英镑。互连器的容量已从850 MW增加到1600 MW,这是通过整合多个互补发展成果而实现的,包括建设英国25年(125公里)中最长的输电线路,其中三个新的变电站,两个静态VAr补偿器(SVC)以及对三个苏格兰发电站的励磁和自动电压调节器(AVR)的修改。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号