...
首页> 外文期刊>Power Systems, IEEE Transactions on >Trade-Off Between UoS Charge and Investment Cost for New Distribution Network Users
【24h】

Trade-Off Between UoS Charge and Investment Cost for New Distribution Network Users

机译:新分销网络用户在UoS费用和投资成本之间进行权衡

获取原文
获取原文并翻译 | 示例
           

摘要

This letter investigates the situation that high use-of-system charge (UoSC) might appear for new network users and studies the potential of network investment to avoid the high charge. It proposes a method to strike the trade-off between UoSC and investment cost, in the form of connection charge (CC). It determines the utilization level where UoSC and CC reach equilibrium. Beyond this level, it is more economical to conduct network investment for new users to avoid high UoSC. The trade-off between the two type charges provides effective signals for new network users to manage their connecting size and location. The concept is illustrated on a two-busbar system.
机译:这封信调查了对于新的网络用户可能出现高系统使用费(UoSC)的情况,并研究了网络投资避免高费用的潜力。它提出了一种以连接费用(CC)的形式在UoSC和投资成本之间进行权衡的方法。它确定UoSC和CC达到平衡的利用率水平。超过此水平,为新用户进行网络投资以避免较高的UoSC成本将更为经济。两种类型的费用之间的折衷为新的网络用户提供有效的信号,以管理其连接大小和位置。该概念在两母线系统上进行了说明。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号