...
首页> 外文期刊>IEEE Transactions on Power Systems >A Chance Constrained Transmission Network Expansion Planning Method With Consideration of Load and Wind Farm Uncertainties
【24h】

A Chance Constrained Transmission Network Expansion Planning Method With Consideration of Load and Wind Farm Uncertainties

机译:考虑负荷和风电场不确定性的机会约束输电网络扩展规划方法

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This paper proposes a chance constrained formulation to tackle the uncertainties of load and wind turbine generator in transmission network expansion planning. A combined Monte Carlo simulation/analytical probabilistic power flow analysis method is first presented to obtain the probability density function of wind turbine generator output. The paper then shows the development of the chance constrained formulation with the inclusion of the wind turbine generator probability density function and probabilistic power flow in the formulation. The proposed formulation is more computationally efficient and can deal with uncertainties in transmission network expansion planning. The power of the new method is shown through the application of the formulation to two test systems.
机译:本文提出了机会约束公式,以解决输电网络扩展规划中负荷和风力发电机的不确定性。首先提出了一种组合的蒙特卡洛模拟/分析概率潮流分析方法,以获得风力发电机输出的概率密度函数。然后,本文展示了机会约束公式的发展,其中包括了风力发电机的概率密度函数和公式中的概率潮流。所提出的公式计算效率更高,并且可以处理传输网络扩展规划中的不确定性。通过将配方应用于两个测试系统,可以显示出新方法的强大功能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号