首页> 外文期刊>Hydrotechnical Construction >SEEPAGE THROUGH A HOMOGENEOUS EARTH-FILL DAM WITH A CUT-OFF WALL ON A PERMEABLE FOUNDATION
【24h】

SEEPAGE THROUGH A HOMOGENEOUS EARTH-FILL DAM WITH A CUT-OFF WALL ON A PERMEABLE FOUNDATION

机译:通过均匀的地球填充水坝渗漏,在可渗透的基础上用剪切墙

获取原文
获取原文并翻译 | 示例
           

摘要

A behavior of the seepage flow through a uniform earth-fill dam constructed on a limited-depth permeable foundation and provided with a cut-off wall has been studied, and effective counter-seepage arrangements within the dam foundation were developed. The studies were conducted by using an electro-hydrodynamic analogy (EHDA) method for various cut-off wall design schemes, including impervious diaphragms, inverted filters, etc. Based on the obtained experimental data, advantages and disadvantages of various counter-seepage schemes were established, and engineering recommendations were developed to increase the seepage safety and performance reliability of earth-fill dams with cut-off walls formed on permeable foundations.
机译:研究了渗流流过均匀的地球填充坝,在有限深度可渗透的基础上构造并提供有截止墙,并开发了坝基内的有效的反渗流装置。 通过使用用于各种截止墙体设计方案的电力学 - 动力学(EHDA)方法进行研究,包括不透水隔膜,倒置过滤器等。基于所获得的实验数据,各种反渗流方案的优点和缺点是 建立,制定了工程建议,以提高土填充水坝的渗流安全性和性能可靠性,在可渗透基础上形成截止墙。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号