ENGINEERING REFIT OF THE DOROGOBUZH HEAT AND ELECTRIC POWER PLANT

机译:多罗格布热电厂的工程改造

获取原文
获取原文并翻译 | 示例
           

摘要

This article discusses the introduction of two gas turbine units with an overall power of 12 MW in 2005 at the Dorogobuzh TETs (Heat and Electric Power Plant). This plant provides energy and heat to the Dorogobuzh industrial cluster and the 30000 people living in the Dorogobuzh region. The need to reconstruct and refit the Dorogobuzh TETs (Smolensk Oblast', Russia), which had become noncompetitive in the market, is examined. The engineering state of the Dorogobuzh TETs before and after the introduction of two gas turbine units with an overall power of 12 MW in 2005 is described in detail; the consumption and thermal and electrical energy output parameters are compared. The technical characteristics of the new equipment, including GTD-6RM gas turbine power units, TGS-6 turbogenerators, and boiler recovery units, are given.
机译:本文讨论了2005年在Dorogobuzh TET(热电厂)上引进的两台总功率为12 MW的燃气轮机装置。该工厂为Dorogobuzh产业集群和Dorogobuzh地区的30000人提供能源和热量。审查了重建和改装Dorogobuzh TET(俄罗斯斯摩棱斯克州)的必要性,这些TET在市场上已不具有竞争力。详细介绍了2005年引进两台总功率为12兆瓦的燃气轮机机组前后Dorogobuzh TET的工程状态;比较了能耗和热能,电能输出参数。给出了新设备的技术特性,包括GTD-6RM燃气轮机动力装置,TGS-6涡轮发电机和锅炉回收装置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号