...
首页> 外文期刊>Hydrotechnical Construction >COMPUTATIONAL AND EXPERIMENTAL TEST OF SELF STARTING REGIMES FOR THE IN-HOUSE NEEDS OF THE PGU-450 STEAM-GAS UNIT AT THE KALININGRAD TETs-2 HEATING AND POWER PLANT DURING SUPPLY DISRUPTIONS
【24h】

COMPUTATIONAL AND EXPERIMENTAL TEST OF SELF STARTING REGIMES FOR THE IN-HOUSE NEEDS OF THE PGU-450 STEAM-GAS UNIT AT THE KALININGRAD TETs-2 HEATING AND POWER PLANT DURING SUPPLY DISRUPTIONS

机译:加里宁格勒TETs-2供热期间电厂和电厂的PGU-450蒸汽炉内部需求自启动系统的计算和实验测试

获取原文
获取原文并翻译 | 示例
           

摘要

The major stages of a computational test of the self starting regimes for the in-house needs of unit No. 1 of the 450 MW steam-gas unit at the Kaliningrad TETs-2 Heating and Electric Power Plant during supply disruptions are described. The results of an experimental test of five regimes are described and compared with the computational data. The results are analyzed. Recommendations are made for changes in the automatic reserve switching algorithms for the 6-kV sections, which, when realized, will ensure easier self startup for the mechanisms providing for in-house needs during supply disruptions.
机译:描述了在加里宁格勒TETs-2供热和发电站450 MW蒸汽燃气机组1号机组内部需求的自启动方案的计算测试的主要阶段,该阶段在供应中断期间进行。描述了五个方案的实验测试结果,并将其与计算数据进行了比较。分析结果。建议更改6 kV区域的自动备用开关算法,一旦实现,将确保在电源中断时满足内部需求的机制更容易自启动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号