MATHEMATICAL GEOFILTRATION MODEL OF THE SYSTEM 'SOIL FOUNDATION - HYDRO INSTALLATIONS' FOR THE PLAVINAS HYDROELECTRIC POWER PLANT

机译:普拉尼瓦斯水力发电厂“土壤基础-水力设施”系统的数学地质过滤模型。

获取原文
获取原文并翻译 | 示例
           

摘要

The Plavinas hydroelectric power plant, which forms the third stage downstream in the cascade of hydro units on the Daugava River (Latvia), was constructed in 1962-66 under a plan developed by the Russian "Gidroproekt" Institute. The configuration of the hydro unit with a 40-m head includes (Fig. 1) a spillway hydroelectric plant with a headwall length of 200 m, a riverbed earthfill dam with a length of 480 m, a left-abutment earthfill dike extending 2 km into the Daugava watershed and its tributary the Lautse River, a right-abutment earthfill dam (approximately 450 m) and its 1-km continuation, a low-head dike. To lower the heads and prevent seepage soil deformations in the foundation of the building structures, the plan calls for various drainage constructions.
机译:普拉维纳斯水力发电厂是道加瓦河(拉脱维亚)上水力发电站的第三级下游,它是根据俄罗斯“ Gidroproekt”研究所制定的计划于1962-66年建造的。水头高度为40米的水电单元的配置包括(图1)溢洪道水力发电厂,其顶壁长度为200 m,河床土石坝的长度为480 m,左桥台土石坝延伸2 km进入道加瓦河分水岭及其支流劳特河,右岸土石坝(约450 m)及其延续1公里的低头堤坝。为了降低水头和防止建筑结构基础中的渗水土变形,该计划要求进行各种排水工程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号