...
首页> 外文期刊>Power UK >Ash fillip for Didcot
【24h】

Ash fillip for Didcot

机译:迪科特的灰鱼片

获取原文
获取原文并翻译 | 示例
           

摘要

RWE Npower has won a battle to allow ash from its Didcot power station to be dumped in nearby lakes. Local campaigners had fought to stop the generator's plan to fill Radley Lakes with ash and had applied to the local council to give the area 'village green' status - a move that would have prevented ash dumping. A public inquiry was held in April and June 2007. However, the local council announced this month that it has refused to give village green status to the 12-hectare (30-acre) site, located between Radley and Abingdon. Councillors voted 10 to four in favour of refusing the protected status.
机译:RWE Npower赢得了一场战斗,允许将其Didcot电站的灰渣倾倒在附近的湖泊中。当地的活动家们为制止该发电机用灰渣填充Radley Lakes的计划而求助于当地的议会,并向地方议会申请给予该地区“乡村绿色”的地位-此举本来可以防止灰渣倾倒。 2007年4月和2007年6月进行了公开调查。但是,地方议会本月宣布,它拒绝赋予位于Radley和Abingdon之间12公顷(30英亩)的土地绿色状态。议员以10票对4票赞成,以拒绝接受保护身份。

著录项

  • 来源
    《Power UK》 |2008年第167期|p.40|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 电工技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号