首页> 外文期刊>Power UK >Dnos Underspending On Capex Says Ofgem
【24h】

Dnos Underspending On Capex Says Ofgem

机译:Dnos的资本支出不足说Ofgem

获取原文
获取原文并翻译 | 示例
           

摘要

Distribution network operators (DNOs) are considerably spending less on capital expenditure (capex) than they allowed to under their price control, says Ofgem. In a new report, Ofgem says that although total operating costs (opex) remain consistent at around £730 million (9% above price control allowances) capex remains some 16% below the allowances set in the last price control. Although capex has increased by 4% over 2005/06 levels, DNOs forecast that capex will be 6% below the total allowances for the full five years of the price control. The companies are two years into the current price control period.
机译:Ofgem说,分销网络运营商(DNO)花费的资本支出(资本支出)大大低于其价格控制所允许的水平。 Ofgem在一份新报告中表示,尽管总运营成本(运营支出)保持在7.3亿英镑左右(比价格控制配额高出9%),但资本支出仍比上次价格控制中设置的配额低约16%。尽管资本支出比2005/06年度增长了4%,但DNO预测资本支出将比价格控制整个五年的总配额低6%。该公司距离目前的价格控制期只有两年。

著录项

  • 来源
    《Power UK》 |2007年第166期|p.30|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 电工技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号